女生被艹网站,国产香蕉av,你的奶好大让我边揉边做视频,午夜激情导航,亚洲欧洲一区二区三区四区,网站黄在线,色婷婷国产精品视频

Architectural engineering
Changle people's Hospital

 
The second phase of the ward building of Changle people's hospital is a frame shear wall structure, with the first floor underground and seventeen floors above the ground,
The total building area is 19034 square meters, and the building height is 62.1 meters. The seismic grade is grade I.
 
Won the 2012 Weifang construction site comprehensive management model project award.